Slide title
Write your caption hereButton
MANUFACTURING FACILITY NORTHWICH – PHASE 1
Client: Cygnet Group
Industry: Structures, Civils, Geo
Value: £2m
Description:
Steel framed manufacturing facility designed for future extension.
Our services included soils investigation, roads and drainage design and the structural design of the steel frame and foundations.
The frame design included allowance for runway beams and for boundary conditions. Foundations were reinforced and cast on vibro treated ground.