Description:

Proposed residential care home development requiring detailed investigation and design to overcome shallow mining issues.

Scope of work undertaken:

  • Desk Study – detailed review of previous third party reports and liaison with the Coal Authority
  • Ground Investigation and grouting via rotary drilling under Coal Authority Permits
  • Identification of a shaft during grouting – probe drilling to assess condition and depth of shaft using steel safety platform and lanyards.
  • Design of Shaft Cap / interface with proposed vibro ground treatment and supervision works
  • Design of grouting works and supervision works
  • Validation closure permits for Coal Authority sign off

Through supervision and liaison with the Coal Authority delays to construction program were minimized.