CITY CENTRE RETAIL REFURBISHMENT PROJECT

Client:   WHSmith

Industry:   Structures

Value:   £5m

Read on

Description:

Main structure is a steel frame with composite steel deck floors.

Main challenges were a major timber facade retention and construction of a new basement between two existing buildings.

Share by: